Maybe I'm dense or something, but I can't make any sense out of them.
As far as I can tell, the Ability prereqs, Resources cost, and time required are all the same as to Repair? And the maintenance intervals are as printed when they are given, and... ? ... when they're not?
As far as I can tell, the Ability prereqs, Resources cost, and time required are all the same as to Repair? And the maintenance intervals are as printed when they are given, and... ? ... when they're not?